Stage is taking shape!


As of Tuesday of this past week, window sills were installed in the sanctuary.  Air ducts and electrical wiring are being installed in the stage this week. Installation of base molding on the first floor is about done. With the exception of the kitchen and sanctuary, the vast majority of renovation work on the first floor should be completed by the end of April.  
Finish coats of paint are being applied. Light fixtures, receptacles, and plumbing fixtures are being installed. Painting and ceramic tile work on the second floor should be well under way by the end of April.  Steel railings are being installed on the main entrance ramp.